首页> 外文会议> >Monte Carlo Simulation and Contingency Enumeration in Bulk Power Systems Reliability Assessment
【24h】

Monte Carlo Simulation and Contingency Enumeration in Bulk Power Systems Reliability Assessment

机译:大电力系统可靠性评估中的蒙特卡罗模拟和权变列举

获取原文
获取外文期刊封面目录资料

摘要

In reliability assessment of bulk power systems, two methods have been largely studied and used: contingency enumeration and non-sequential Monte Carlo simulation. Both have their wellknown advantages and drawbacks. Contingency enumeration is conceptually simple and usually requires low computational effort. Conversely, Monte Carlo simulation is computationally harder, but much more versatile to model random aspects. This paper depicts some major aspects regarding both methods. It also shows that it is not a matter of choosing the definite and unique technique, but how they can be used in a complementary way. A real power system, based on the Brazilian interconnected electrical system, and the commercial program NH2 are used to illustrate that both methods are feasible to bulk power systems, and can be used in order to achieve complementary results
机译:在大容量电力系统的可靠性评估中,已广泛研究和使用了两种方法:权变枚举和非顺序蒙特卡洛模拟。两者都有其众所周知的优点和缺点。意外事件枚举在概念上很简单,通常需要很少的计算工作。相反,蒙特卡洛模拟在计算上比较困难,但是对于随机方面的建模则更具通用性。本文介绍了有关这两种方法的一些主要方面。它还表明,选择确定性和唯一性技术不是问题,而是如何以互补的方式使用它们。以巴西的互连电力系统为基础的实际电力系统和商业程序NH2用于说明这两种方法对于大容量电力系统都是可行的,并且可以用来获得互补的结果

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号