首页> 外文会议> >Fairness and comparability-guiding principles for RTO transmission expansion planning
【24h】

Fairness and comparability-guiding principles for RTO transmission expansion planning

机译:RTO传输扩展规划的公平性和可比性指导原则

获取原文

摘要

Summary form only given. The Eastern Interconnection is dividing into Regional Transmission Organizations. These now organizations are naming themselves independent system operators, independent transmission companies, transmission owners, stakeholders, transmission customers and etc. They take the place of the transmission operations and planning segments of integrated electrical utilities. No longer is generation planning function and transmission planning function moving hand-in-hand within a given integrated utility. Now the process has become an open process across the interconnection under the functional control of independent system operators. This presentation discusses the state of reorganization and then near and far term perceptions on how grid expansion is to be accomplished. Who will be the stakeholders, the regulators, the customers, the owners? Who will pay for the expansions? How will reliability be assured?.
机译:仅提供摘要表格。东部互连分为区域传输组织。现在,这些组织将自己命名为独立的系统运营商,独立的输电公司,输电拥有者,利益相关者,输电客户等。它们取代了输电运营和综合电力公司的规划部门。发电计划功能和输电计划功能不再在给定的集成公用事业中携手并进。现在,在独立系统操作员的功能控制下,该过程已成为跨互连的开放过程。本演示文稿讨论了重组的状态,然后讨论了如何实现电网扩展的近期和远期看法。谁将是利益相关者,监管者,客户,所有者?谁来支付扩展费用?如何确保可靠性?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号