The transmission of large amounts of power using radial systems through long distances with acceptable power quality levels represents a big challenge, specially when transmission system expansion is delayed by financial constraints. This appears on CHESF North transmission system where the high length of transmission lines, the presence of a great number of small industrial loads, the high levels of power transmitted, long fault clearing times on subtransmission system fed by 230 kV substations and elevated shunt capacitances of expanded bundle transmission lines (EBTL) used to increase the transmission capability, produce long duration voltage sags on fault clearing, followed by high voltage swells. To quantify these effects and propose actions to minimize their impact over the transmission system, as the use of special protection schemes, dynamic and transient studies were performed and compared with site tests, with detailed modeling of the involved elements, such as static VAr compensators, motor loads and EBTL.
机译:使用径向系统通过可接受的电能质量水平的长距离远距离传输大量电力是一个巨大的挑战,特别是当传输系统的扩展由于财务限制而延迟时。这出现在CHESF North输电系统上,该输电线路的长度较长,存在大量的小型工业负载,输电水平高,由230 kV变电站供电的输电系统的故障清除时间长,并且分流电容增大。扩展的束传输线(EBTL)用于提高传输能力,在清除故障时产生长时间的电压骤降,随后出现高压骤升。为了量化这些影响并提出行动,以最大程度地减少对传输系统的影响,通过使用特殊的保护方案,进行了动态和瞬态研究,并将其与现场测试进行了比较,并对涉及的要素(例如静态VAr补偿器)进行了详细建模,电机负载和EBTL。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号