首页> 外文会议> >Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook nuclear plant units 1 and 2
【24h】

Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook nuclear plant units 1 and 2

机译:唐纳德·库克核电站1号和2号机组反应堆保护和控制过程仪表数字升级项目的设计概念

获取原文

摘要

As the nation's nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear plant, a decision was made to replace a major portion of the plant's protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade.
机译:作为国家的核电站时代,需要考虑升级其电子保护和控制系统的迫切。频繁校准和监视造成的硬件过时和机械磨损在定义其使用寿命方面发挥了重要作用。在Cook核电站,做出决定,以更换厂房保护和控制系统的决定。本文介绍了在此成功升级中涉及的工程流程,并解释了在执行数字升级时制造的许多决策的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号