首页> 外文会议> >Prioritizing processes for better implementation of statistical process control techniques
【24h】

Prioritizing processes for better implementation of statistical process control techniques

机译:优先安排流程以更好地实施统计流程控制技术

获取原文

摘要

Statistical process control (SPC) techniques have been widely used in industry. A problem in the implementation of SPC techniques is that usually there are many processes involved in a production line and high priority has to be given to some of them in the face of constraints of available resources. In this paper, the authors discuss some preliminary studies of techniques for process prioritization in SPC implementation and the related decision making approaches. They first present a simple classification scheme based on the statistical and technical importance of each process. Then the use of the quality function deployment (QFD) technique is discussed. A theoretical approach based on the analytic hierarchy process (AHP) technique is then recommended to solve the exact prioritization problem.
机译:统计过程控制(SPC)技术已在工业中广泛使用。 SPC技术实施中的一个问题是,生产线通常涉及许多流程,面对可用资源的限制,必须对其中某些流程赋予较高的优先级。在本文中,作者讨论了SPC实施中流程优先级排序技术的一些初步研究以及相关的决策方法。他们首先根据每个过程的统计和技术重要性提出一种简单的分类方案。然后讨论了质量功能部署(QFD)技术的使用。然后建议一种基于层次分析法(AHP)技术的理论方法来解决确切的优先级排序问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号