首页> 外文会议> >Application of a hybrid generation/utility assessment heuristic to a class of scheduling problems
【24h】

Application of a hybrid generation/utility assessment heuristic to a class of scheduling problems

机译:混合发电/效用评估启发式方法在一类调度问题中的应用

获取原文

摘要

A two-stage heuristic solution approach for a class of multiobjective, n-job, one-machine scheduling problems is described. Minimization of job-to-job interference for n jobs is sought. The first stage generates alternative schedule sequences by interchanging pairs of schedule elements. The set of alternative sequences can represent nodes of a decision tree; each node is reached via decision to interchange job elements. The second stage selects the parent node for the next generation of alternative sequences through automated paired comparison of objective performance for all current nodes.
机译:描述了针对一类多目标,n作业,单机调度问题的两阶段启发式求解方法。寻求使n个工作的工作对工作的干扰最小化。第一阶段通过交换时间表元素对来生成备选时间表序列。这组替代序列可以表示决策树的节点;通过交换作业元素的决定可以到达每个节点。第二阶段通过对所有当前节点的目标性能进行自动配对比较,为下一代替代序列选择父节点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号