首页> 外文会议> >Design basis for an integrated project control system
【24h】

Design basis for an integrated project control system

机译:集成项目控制系统的设计基础

获取原文

摘要

The author suggests overall objectives for the design of a project control system, paying particular attention to the subject of integration. He discusses the more important factors which determine the scope of the system, including: who will be using the system (client or contractor); the nature of the organisation and other systems in use; the degree of procedural definition; and economic justification. There is a discussion of how the potential scope might be modified by the existing organisational environment, and in particular by other functional systems (e.g. finance, engineering design, materials). This raises the fundamental question of whether the system is to be designed to serve an existing organisation, or whether the organisation itself could be changed in order to make the most effective use of information technology. A conclusion is drawn on the type of system which seems most appropriate for the use of projects run by a client organisation.
机译:作者提出了项目控制系统设计的总体目标,尤其要注意集成的主题。他讨论了决定系统范围的更重要的因素,包括:谁将使用系统(客户或承包商);组织和所使用的其他系统的性质;程序定义的程度;和经济理由。讨论了如何通过现有组织环境,尤其是通过其他职能系统(例如,财务,工程设计,材料)来修改潜在范围。这就提出了一个基本问题,即是否要设计该系统以服务于现有组织,或者是否可以更改组织本身以最有效地利用信息技术。得出了一种系统类型的结论,该系统似乎最适合使用由客户组织运行的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号