【24h】

Ormen Lange Processing Plant in Norway - noise control – importance of early involvement

机译:挪威Ormen Lange加工厂-噪音控制-及早参与的重要性

获取原文

摘要

The Ormen Lange Onshore Processing Plant, on Norway’s west coast is the processing unit for the gas from the Ormen Lange field in the Norwegian Sea. The project carried out by Hydro as operator for the development phase is the largest industrial project in Norway covering an area of 900 000 m~2 with a total project cost of 10 billion US$.Since there are a number of private dwellings surrounding the plant, strict noise limits have been set by the Authorities to reduce the community noise impact. Due to early involvement and genuine interest by Company and Contractor the strict community noise limits were early in the pre-engineering phase converted to equipment noise limits and these have been strictly followed up throughout the project. If necessary, noise reducing measures have been implemented by vendor. The vendor noise guarantees and measurement results have been used to simulate the community noise level that may be experienced after start-up of the plant. One year before this happens a good margin is still being maintained. Verification noise measurements will be performed during start-up and operation of the plant. The operation noise will be compared to Project noise limits and background noise measurements.
机译:位于挪威西海岸的Ormen Lange陆上加工厂是来自挪威海Ormen Lange气田的天然气处理装置。由水电公司作为开发阶段的运营商进行的项目是挪威最大的工业项目,占地面积90万平方米〜2,项目总成本为100亿美元。 ,当局已设定了严格的噪音限制,以减少社区的噪音影响。由于公司和承包商的早期参与以及真正的兴趣,严格的社区噪声限制在工程前阶段就已经转换为设备噪声限制,并且在整个项目中都得到了严格的跟进。如有必要,供应商已采取降噪措施。供应商的噪音保证和测量结果已用于模拟工厂启动后可能遇到的社区噪音水平。在此发生之前的一年,仍保持着良好的利润率。验证噪声测量将在工厂启动和运行期间执行。将操作噪声与项目噪声限制和背景噪声测量值进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号