The design and construction of a shield tunnel which have a non-excavating extension part in the middle by the Japan longest distance class

机译:在日本最长距离等级的中间有非挖掘延伸部分的盾构隧道的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

This shield tunnel, referred to as Kasugai Public Utility Conduit, was ordered by the Chubu Regional Bureau of the Ministry of Land, Infrastructure and Transport and, upon completion, will have an inner diameter of 4.2 m and total tunnel length of 6.82 km. Further, three underground sections will be cut and widened 2.5 m in diameter and 10~17 m in length from inside the path of the tunnel. The ground consists of hard, cobblestone-mixed, diluvial gravel layer. Boring is to be performed by use of one shield machine. With the aim of proper execution of construction, the following equipment and methods were utilized to carry out the highly difficult work successfully. 1. High-durability shield machine constructed by the relay bit construction method. 2. New quick block (QB) segments for high-speed automatic assembly and wedge block (WB) segments. 3. Construction method of underground widening in which a shield machine for widening the tunnel.
机译:该盾构隧道被称为国立春日井公用管道,由国土交通省中部地方局订购,完工后,其内径为4.2 m,隧道总长度为6.82 km。此外,将从隧道路径内部切开三个地下部分,并扩宽直径2.5 m和长度10至17 m。地面由坚硬的,鹅卵石混合的,稀释的砾石层组成。钻孔应使用一台盾构机进行。为了正确执行施工,以下设备和方法被用来成功地完成高度困难的工作。 1.采用中继位构造方法构造的高耐久性屏蔽机。 2.用于高速自动组装的新快速块(QB)段和楔块(WB)段。 3.地下拓宽的方法,其中,盾构机用于拓宽隧道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号