首页> 外文会议>ITA-AITES World Tunnel Conference; 20050507-12; Istanbul(TR) >Tunnel construction with Earth Pressure Balance shields and measures to minimize settlements under urban infrastructure in London
【24h】

Tunnel construction with Earth Pressure Balance shields and measures to minimize settlements under urban infrastructure in London

机译:带有“土压力平衡”护罩的隧道建设以及在伦敦城市基础设施下尽量减少沉降的措施

获取原文
获取原文并翻译 | 示例

摘要

Tunnelling of Section C250 was performed with two EPB shields over a length of 5.3 km in the area of the city of London under London Underground and Network Rail facilities without interrupting operation. The construction ground conditions encountered - London Clay, Woolwich and Readings Beds, the Upnor Formation and Thanet Sands - placed vastly differing requirements on the supporting pressure of the EPB TBMs, conditioning, quantity surveying and volume control of the excavated soil as well as the dewatering measures.
机译:在伦敦市范围内,在伦敦地铁和网络铁路设施下,用两个EPB盾构进行了C250节的掘进,全长5.3 km。遇到的建筑地面条件-伦敦粘土,伍尔维奇和雷丁床,Upnor地层和Thanet砂-对EPB TBM的支撑压力,条件,开挖土壤的量测和体积控制以及脱水提出了截然不同的要求措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号