首页> 外文会议>ITA-AITES World Tunnel Conference; 20050507-12; Istanbul(TR) >Development of divergence construction technology for deep road tunnels
【24h】

Development of divergence construction technology for deep road tunnels

机译:深层公路隧道分叉施工技术的发展

获取原文
获取原文并翻译 | 示例

摘要

In recent years, the need for tunnel constructions at greater depths using shield tunneling is increasing for further tunnel projects in urban areas in Japan. In constructing divergence portions with main tunnels at greater depth, conventional methods such as cut and cover may not be appropriate due to the high cost of construction and the considerable influence on the surroundings.rnThe authors developed the new methods where the divergence portion and emergency parking zone from the pre-excavated main shield tunnel are constructed without any work from the ground surface.rnThe method to construct the divergence portion is called the Expandable and Shrinkable Tube Method for Junctions (ES-J method), and the method to locally expand the width in small lengths for emergency parking zones, etc., is called the Segment Expansion Method by Excavation (Seg-Jet method). This paper gives an outline of the ES-J method and Seg-Jet method, and their development technologies.
机译:近年来,对于日本城市地区中的其他隧道项目,使用屏蔽隧道进行更深的隧道建设的需求正在增加。在主隧道较深的地方建造分叉部分时,由于建造成本高以及对周围环境的影响较大,因此不宜采用传统的切割和覆盖方法。作者开发了新的方法,即分叉部分和紧急停车预先开挖的主盾构隧道的施工区域无需在地面上进行任何工作。rn散布部分的构造方法称为结点可伸缩管法(ES-J方法),局部扩展构造的方法称为土方结构。紧急停车区等的小长度的宽度被称为通过挖掘的分段扩展方法(Seg-Jet方法)。本文概述了ES-J方法和Seg-Jet方法及其开发技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号