【24h】

TASK 7 of the IEA PV Power Systems Program - Achievements and Outlook

机译:IEA光伏电力系统计划的任务7-成就与展望

获取原文
获取原文并翻译 | 示例

摘要

Since January 1, 1997, Task 7 has been active 'within IEA's PV Power Systems Program. The key objectives of Task 7 are to enhance the architectural quality, the technical quality and the economic viability of PV systems in the built environment and to assess and remove non-technical barriers for their introduction as an energy-significant option. Task 7 is an international collaborative programme, linking PV developments of Europe, the US, Japan and Australia to each other. The work in Task 7 concentrates on assisting the long-term development of building integrated PV, as well as contributing to short term marketing opportunities. The Task will be completed at the end of 2001. This paper presents information about the various achievements of the Task, as well as an outlook towards future international collaboration in the field of PV in the Built Environment.
机译:自1997年1月1日以来,任务7在IEA的PV电力系统计划中一直处于活动状态。任务7的主要目标是提高建筑环境中光伏系统的建筑质量,技术质量和经济可行性,并评估和消除将其作为能源重要选择引入的非技术性障碍。任务7是一项国际合作计划,将欧洲,美国,日本和澳大利亚的光伏发展相互联系起来。任务7中的工作集中在协助建筑一体化光伏的长期发展以及为短期营销机会做出贡献。该任务将于2001年底完成。本文介绍了该任务的各项成就,以及对建筑环境光伏领域未来国际合作的展望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号