首页> 外文会议>Iron steel technology conference;AISTech 2010 >Production Improvement of No. 2 BOSP at ESAI
【24h】

Production Improvement of No. 2 BOSP at ESAI

机译:ESAI 2号BOSP的生产改进

获取原文

摘要

Many of the initiatives listed in this report could be considered very small steps but taken as a whole they produced a very large result. By investigating the process flow accurately determining where delays and process bottlenecks were located low cost high gain projects could be identified and implemented. All projects and people working together provided a production increase of 32% within one year as seen in Figure 3. This production increase was sustained over 2 consecutive months and would have reliably continued if the global economic situation had not rapidly reduced steel demand.
机译:本报告中列出的许多举措可以被认为是很小的步骤,但总体而言,它们产生了很大的成果。通过准确地调查流程,确定延迟和流程瓶颈的位置,可以识别并实施低成本,高收益的项目。如图3所示,所有项目和共同努力的人员在一年之内提供了32%的产量增长。这种产量增长连续两个月得以维持,如果全球经济形势并未迅速减少钢铁需求,这种增长将可靠地持续下去。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号