The new technologies of constructing the shield tunnel for the power cable in Osaka

机译:大阪电力电缆屏蔽隧道施工新技术

获取原文
获取原文并翻译 | 示例

摘要

In recent years, a lot of new technologies and new construction methods are used for the city shield works in Japan. The reason was the necessity for complicated geology, severe conditions of location, the environmental preservation, the cost reduction, and shortening work periods. In this report, we describe the outline of the new technology and new construction methods adopted as the shield works in the 500kV-power-transmission-line project within Osaka City by the Kansai Electric Power Co., Inc.
机译:近年来,日本的城市屏蔽工程采用了许多新技术和新施工方法。原因是需要复杂的地质条件,严格的选址条件,环境保护,降低成本和缩短工作周期。在本报告中,我们描述了关西电力有限公司在大阪市内500kV输电线路项目中用作屏蔽工程的新技术和新施工方法的概况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号