【24h】

Incremental Connector Routing

机译:增量连接器布线

获取原文
获取原文并翻译 | 示例

摘要

Most diagram editors and graph construction tools provide some form of automatic connector routing, typically providing orthogonal or poly-line connectors. Usually the editor provides an initial automatic route when the connector is created and then modifies this when the connector end-points are moved. None that we know of ensure that the route is of minimal length while avoiding other objects in the diagram. We study the problem of incrementally computing minimal length object-avoiding poly-line connector routings. Our algorithms are surprisingly fast and allow us to recalculate optimal connector routings fast enough to reroute connectors even during direct manipulation of an object's position, thus giving instant feedback to the diagram author.
机译:大多数图编辑器和图形构造工具都提供某种形式的自动连接器布线,通常提供正交或折线连接器。通常,创建连接器时,编辑器会提供初始自动路线,然后在移动连接器端点时对其进行修改。我们所知道的没有一个能确保路线的长度最小,同时避免图中的其他对象。我们研究了递增计算最小长度的避免对象折线连接器路由的问题。我们的算法出奇的快速,并且使我们能够以足够快的速度重新计算最佳的连接器布线,即使在直接操纵对象位置的过程中也可以重新布线,从而将即时反馈反馈给图表作者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号