首页> 外文会议>International symposium on formation damage control >Horizontal gravel packing technique for slim, cased holes in highly permeable zones: a single well case history
【24h】

Horizontal gravel packing technique for slim, cased holes in highly permeable zones: a single well case history

机译:水平砾石充填技术用于高渗透率区域的细长套管井:单井案例历史

获取原文
获取原文并翻译 | 示例

摘要

Gravel packing is becoming a common practice for controlling unconsolidated sands inhorizontal wellbores. So far. hori/ontal gravel packing has been applied almost exclusively to open holes with screeens in them. If a formation has a high permeability, and therefore a high fluid loss rate. placement of a gravel pack may be prevented by premature dehydration and bridging of the gravel pack sand in the wellbore/screen annulus. The usual method of preventing these high fluid losses and the resultant bridging is to damage the formation face prior to gravel packing. The damage mechanism is usually salt. calcium carbonate, or other particles that seal off the formation face. Once gravel packing is completed. the formation damage is (hopefully) remediated using acid or undersaturated brines to restore the comletion's productivity. Theere is, however, a risk that the damage cannot be successfully removed once it is gravel packed against the formation face. Acid diversion is also a problem when attempting to remediate damage in an open-hole gravel packed completion.
机译:砾石充填正在成为控制非固结砂质水平井眼的常用方法。至今。 hori / ontal砾石充填几乎仅用于带有筛网的裸眼。如果地层具有较高的渗透性,并因此具有较高的漏失率。砾石充填的放置可以通过过早的脱水和在井眼/筛环中桥接砾石充填的沙子来防止。防止这些高流体损失和由此造成的桥接的常用方法是在砾石充填之前破坏地层。破坏机理通常是盐。碳酸钙或其他封闭地层的颗粒。一旦砾石填充完成。 (希望)使用酸或不饱和盐水修复地层损害,以恢复完井的生产率。然而,Theere的风险在于一旦将碎石堆积在地层上就无法成功消除损坏。当试图补救裸眼砾石充填完井中的损坏时,酸转移也是一个问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号