首页> 外文会议>International Symposium on Flood Defence vol.2; 20020910-13; Beijing(CN) >Floods, new design-flood criteria and dam refurbishment in Sweden
【24h】

Floods, new design-flood criteria and dam refurbishment in Sweden

机译:瑞典的洪水,新的设计洪水准则和大坝整修

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The serious flooding that occurred in Sweden in 1983 led to the establishment of Floedeskommitten. Its main task was to prepare new guidelines for determination of design floods for Swedish dams. Floedeskommitten released its final report in 1990. In the guidelines, the design flood for a dam is obtained through transformation of extreme climatological and hydrological conditions. The new guidelines result generally in higher design floods for existing dams than they were constructed for and many spillways have too low discharge capacity. Based on the design-flood guidelines, the hydropower sector has worked out dam-safety guidelines, RIDAS, and application instructions governing the dam safety practice in the country. As recommended, all class I (high hazard) dams have to be designed to discharge the design floods. Several refurbishment examples are given to illustrate the on-going work on dam safety carried out by Vattenfall AB. The refurbishment of the dams considers as a whole technical, economical and environmental aspects.
机译:1983年在瑞典发生的严重洪灾导致Floedeskommitten的建立。它的主要任务是为确定瑞典大坝的设计洪水准备新的准则。 Floedeskommitten在1990年发布了最终报告。在指导原则中,大坝的设计洪水是通过极端气候和水文条件的转变而获得的。新准则通常导致现有大坝的设计洪水比建造时要大,许多溢洪道的排泄能力也太低。根据设计洪水准则,水电部门制定了大坝安全准则,RIDAS和适用于该国大坝安全实践的应用说明。根据建议,所有一级(高危害)大坝都必须设计成能排放设计洪水。给出了几个整修示例,以说明Vattenfall AB正在进行的大坝安全工作。大坝的整修从技术,经济和环境方面考虑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号