首页> 外文会议>International symposium on concrete faced rockfill dams(CFRD2000) >TIANSHENGQIAO-l CFRD - MONITORING PERFORMANCE -LESSONS NEW TRENDS FOR FUTURE CFRDs (CHINA)
【24h】

TIANSHENGQIAO-l CFRD - MONITORING PERFORMANCE -LESSONS NEW TRENDS FOR FUTURE CFRDs (CHINA)

机译:天生桥l CFRD-监测和性能-未来CFRD的经验教训和新趋势(中国)

获取原文
获取原文并翻译 | 示例

摘要

Tianshengqiao l Dam (hereinafter TSQ-1) was completed in 1999 and the reservoir has been partially filled during rainy seasons of 1998 and 1999, reaching 92% of the total head. Six hundred twenty instruments were installed for monitoring the dam performance. Conventional and modern instruments used in TSQ-1 are presented along with the major trends and significant values recorded by the instrumentation. Behavior of both the instrumentation and the dam are analyzed. Some lessons learned in TSQ-1 are shown up and based on them new trends for the instrumentation are suggested aiming to contribute for future high CFRDs, especially in China where this domestic experience might be applied in CFRDs as high as TSQ-1 or even higher, currently under design.
机译:天生桥大坝(以下简称TSQ-1)于1999年完工,在1998年和1999年的雨季期间,水库已部分充满,达到总水头的92%。安装了六百二十个仪器来监测大坝的性能。介绍了TSQ-1中使用的常规和现代仪器,以及仪器记录的主要趋势和重大价值。分析了仪器和水坝的行为。列出了在TSQ-1中吸取的一些经验教训,并在此基础上提出了仪器仪表的新趋势,旨在为将来的高CFRD做出贡献,特别是在中国,这种国内经验可能会应用于TSQ-1甚至更高的CFRD中。 ,目前正在设计中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号