Research On Models And Ways Of Project Interim Evaluation

机译:项目中期评价模型与方法研究

获取原文
获取原文并翻译 | 示例

摘要

Project management (PM), Project Evaluation (PE) has formed theories and methods. In this paper, we extend the traditional concept and understanding of PE and present the concept of PE corresponding to the whole project life cycle, and divide it into Project Ex Ante Evaluation (PAE), Project Interim Evaluation (PIE) and Project Ex Post Evaluation (PPE). We primary analyze the model of PIE and present four models of PIE. They are Two-dimensional Framework Model, the Clustering Evaluation Model, the Step-advance Evaluation Model and the Data Envelopment Analysis Model.
机译:项目管理(PM),项目评估(PE)已形成理论和方法。在本文中,我们扩展了对PE的传统概念和理解,并提出了与整个项目生命周期相对应的PE概念,并将其分为事前评估(PAE),事中评估(PIE)和事后评估(PPE)。我们主要分析PIE模型,并介绍四种PIE模型。它们是二维框架模型,聚类评估模型,逐步评估模型和数据包络分析模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号