Directing Thermal Vacuum (TVAC) Chamber Testing at a Facility in another State Lessons Learned

机译:在另一州的工厂指导热真空(TVAC)室内测试

获取原文
获取原文并翻译 | 示例

摘要

Thermal Vacuum (TVAC) testing is one of the final environmental tests performed prior to shipment to the launch facility. Since, TVAC test is scheduled so close to delivery, it is critical that a chamber is ready and available when flight hardware is ready for testing to begin. Sometimes, local vacuum chambers are occupied at that time and another vacuum testing facility must be found, even if it is in another state in an unfamiliar facility. The Naval Research Laboratory (NRL) has a premier thermal vacuum chamber facility. NRL facilities include one large test chamber, two medium sized test chambers, and several small test chambers. Several spacecraft engineering companies have utilized NRL facilities to operate TVAC temperature cycling testing. In addition, NRL has opportunities to utilize other vacuum chamber facilities, when NRL chambers are already occupied by other flight hardware assemblies.. Thermal vacuum test planning includes understanding facility capabilities and upgrade requirements, scheduling of testing and personnel, and training of test personnel to be experts in their roles and responsibilities. Scheduling personnel to travel and work shift work is one of the hardest parts of working in another facility. Scheduling requires shifts to cover 24 hours a day for 7 days a week for months at a time. The testing team becomes sizeable due to the quantity of shifts and various roles that have to be filled. Therefore, communication amongst people becomes critical. Proper planning and procedures understood by the team means that tasking can be delegated to the team on travel. TVAC in another state requires added complexities and increases the importance of constant communication between all stakeholders.
机译:热真空(TVAC)测试是装运到发射设施之前进行的最终环境测试之一。由于TVAC测试排定在交付期附近,因此至关重要的是,在准备好开始进行测试的飞行硬件时,要准备好舱室并准备就绪。有时,当时当地的真空室被占用,并且必须找到另一个真空测试设备,即使它在不熟悉的设备中处于另一种状态。海军研究实验室(NRL)拥有一流的热真空室设施。 NRL设施包括一个大测试室,两个中型测试室和几个小测试室。几家航天器工程公司已利用NRL设备进行TVAC温度循环测试。另外,当NRL舱已经被其他飞行硬件组件占用时,NRL就有机会利用其他真空舱设施。热真空测试计划包括了解设施的功能和升级要求,测试和人员的日程安排以及对测试人员的培训。成为角色和责任方面的专家。安排人员旅行和轮班工作是在另一家工厂工作的最困难的部分之一。日程安排要求轮班以每周7天,每天24小时,每月几个月的时间进行。由于轮班的数量和必须填补的各种角色,测试团队变得非常庞大。因此,人与人之间的交流变得至关重要。团队理解正确的计划和程序意味着可以将任务分配给团队。另一个州的TVAC要求增加复杂性,并增加所有利益相关者之间不断沟通的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号