【24h】

A Method for Measuring Cycle Time Using Engineering Orders

机译:一种使用工程订单测量周期时间的方法

获取原文
获取原文并翻译 | 示例

摘要

There are several methods which may be used to measure cycle time for programs. Some lack the ability to correlate the data to the development process taskks. One reason to measure cycle time is to use the data to peform discussed in this paper analyzes the data collected from a labor collection system. Every direct employee uses the labor collection system to enter the time they worked on specific tasks. This method correlates the hours worked to the development process tasks. This involves standardized cost accounting and Engineering (work) Order (EO) practices as well as the deployment of an Integrated Product Development System.
机译:有几种方法可用于测量程序的循环时间。有些缺乏将数据与开发过程任务相关联的能力。测量周期时间的原因之一是使用本文讨论的数据来分析从劳动力收集系统收集的数据。每个直接员工都使用劳力收集系统来输入他们从事特定任务的时间。此方法将工作时间与开发过程任务相关联。这涉及标准化的成本会计和工程(工作)订单(EO)实践,以及集成产品开发系统的部署。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号