Rehabilitation and upgrading of a zoned fill dike

机译:分区堤防的修复和升级

获取原文
获取原文并翻译 | 示例

摘要

The rehabilitation of a zoned fill dike is presented. The dike drawings showed that it is a zoned fill type having a sandy loam core with a filter at the downstream toe and sandstone upstream shoulder. More than two decades after construction, the upstream slope of the dike was submerged by water for the first time. Field observations showed the presence of some cracks at the crest and upstream and downstream slopes and no seepage was observed. Further investigation of the soil of the upstream shoulder showed that it is cemented loamy sand and not sandstone as shown in the drawings. After submergence, the soil of the upstream shoulder lost its cementation. Consequently, two stabilization measures were carried out. The first one was an urgent measure to prevent any further deterioration while the second one was a permanent protection of the dike. The urgent measure consisted of quickly constructing a stabilizing mass of graded sandstone resting on a suitable aggregate filter to support the downstream slope. The second stabilization measure was to place a prism of loamy sand as an extension of the upstream slope covered by three graded filters. Blocks of sound granite mother rock were placed above the upstream surface to protect it against wave and surge effects.
机译:介绍了分区填充堤防的修复。堤坝图显示,它是一种带分区填充的类型,具有砂壤土芯,在下游脚趾处有过滤器,在上游肩部处有砂岩。施工结束二十多年后,堤防的上游斜坡首次被水淹没。现场观察表明,在波峰以及上游和下游的斜坡上都存在一些裂缝,没有发现渗漏。对上游肩部土壤的进一步研究表明,它是水泥质壤土砂而不是砂岩,如图所示。浸没后,上游肩部的土壤失去了胶结作用。因此,采取了两种稳定措施。第一个是防止任何进一步恶化的紧急措施,而第二个是对堤防的永久保护。紧急措施包括迅速建造稳定的分级砂岩块,将其放在合适的骨料过滤器上以支撑下游坡度。第二个稳定措施是放置一块壤土沙柱,作为上游坡度的延伸,该坡度由三个渐变滤池覆盖。将优质花岗岩母岩块放置在上游表面上方,以防止其受到波浪和浪涌影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号