Monitored construction of a high embankment on soft soil, reinforced by stone columns

机译:受监控的软土高路堤施工,石柱加固

获取原文
获取原文并翻译 | 示例

摘要

In 2003 a 11.5 m high embankment was constructed on approximately the same site where, 17 years previously, the soft alluvium deposits of the Rizana river failed beneath the 7 m high embankment, which was being built at that time at this location. The subsoil beneath the new Srmin embankment was reinforced by approximately 12 m high stone columns in order to ensure sufficient safety during and after construction, as well as small relative settlement between the embankment and the neighbouring deeply-founded structures during operation of the motorway. The results of design calculations have been compared with the measurements performed during construction of the embankment.
机译:2003年,大约在同一地点建造了11.5 m高的堤防,而在17年前,当时在此位置建造的7 m高的堤防之下,Rizana河的软冲积层破裂了。新的Srmin路堤下方的地下土层被约12 m高的石柱加固,以确保在施工期间和施工后的足够安全,以及在高速公路运营期间路堤与邻近的深层结构之间的较小相对沉降。设计计算的结果已与路堤施工期间进行的测量进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号