首页> 外文会议>International Conference on River Basin Management; 200509; Bologna(IT) >Enhancement of flood safety, rural and regional development in the Hungarian part of the Tisza Valley (the new Vasarhelyi plan)
【24h】

Enhancement of flood safety, rural and regional development in the Hungarian part of the Tisza Valley (the new Vasarhelyi plan)

机译:增强蒂萨河谷匈牙利地区的洪水安全,农村和区域发展(新的Vasarhelyi计划)

获取原文
获取原文并翻译 | 示例

摘要

Between 1998 and 2001, four abnormal flood waves have passed down the River Tisza, The total costs of flood fighting, emergency measures and reconstruction have amounted to some €440 million. The government has approved of the conceptual plan of enhancing flood safety in the Tisza Valley and obliged the competent ministries to elaborate detailed plans for Stage I of the development program. The development proposal comprises a complex program, which goes beyond the creation of a higher level of flood safety; the improvement of the living standards of the rural and urban population in the region and the formulation and introduction of new types of agro-ecological land use in the area of the emergency flood retention reservoirs. In Stage I, which covers the years 2004 to 2007, the proposed flood safety enhancement measures include the restoration of the flow conveying capacity of the flood bed, the conservation oriented revitalisation thereof along the Upper Tisza, as well as along that between Szolnok town and the southern national boundary, Work will also be started on the emergency retention reservoirs, of which six are contemplated at strategic sites. The costs of the first four years have been estimated at €480 million, one-half thereof devoted to flood control measures, the other to rural development, agro-ecological farming and infrastructure modernisation projects, The Strategic Environmental Assessment has been completed to EU standards, the rural and regional development opportunities related to the program have been explored together with the demands for intensifying economy and improving the infrastructure. Work on the first reservoirs and on clearing the high-water bed has been scheduled to start in autumn 2004.
机译:在1998年至2001年之间,蒂萨河(Tisza)上流了四次异常的洪水波。抗洪,应急措施和重建的总费用总计达4.4亿欧元。政府已经批准了提高蒂萨河谷洪水安全性的概念计划,并责成有关部门为发展计划的第一阶段制定详细计划。该开发建议包括一个复杂的程序,该程序超出了创建更高级别的洪水安全性的范围;改善该地区农村和城市人口的生活水平,并在应急蓄洪库区制定和引进新型农业生态土地利用方式。在第一阶段(涵盖2004年至2007年)中,拟议的洪水安全增强措施包括恢复洪水床的水流输送能力,在蒂萨河上游以及在索尔诺克镇和萨尔诺克镇之间的保护性复兴。在南部国家边界,也将在紧急保留水库上开始工作,其中有六个在战略性地点。前四年的费用估计为4.8亿欧元,其中一半用于防洪措施,另一半用于农村发展,农业生态农业和基础设施现代化项目,《战略环境评估》已按照欧盟标准完成,与该计划有关的农村和区域发展机会已被探索,同时也涉及对经济发展和改善基础设施的需求。第一批水库和清理高水位的工作计划于2004年秋季开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号