【24h】

Temperature of fin-plate beam-to-beam connections

机译:鳍板梁到梁连接的温度

获取原文
获取原文并翻译 | 示例

摘要

The prediction of the temperature of the beam-to-beam connection based on the temperature of the lower flange of the beam, see Annex D of EN 1993-1-2:2005, was approved by the experiment till about 45 min of fire. The prediction may be improved by modification of the reduction factor 0,90 instead of 0,88 and 0,81 instead of 0,62. With this improvement will be the prediction conservative but will be valid all trough the grooving phase. According to the FE modelling is the largest difference in the beam and connection temperature during the medium time fire. Under the fast fire is the temperature predicted from the midspan lower flange temperature overestimated. Under the long fires the analytical prediction may underestimate the reached temperatures. The new generation of the analytical models for the prediction of the temperature in the connections, which are under preparation as a background for European standard, are focussed to improve the prediction of the cooling phase of the fire curve.
机译:实验批准了基于梁下部凸缘温度的梁到梁连接温度的预测(参见EN 1993-1-2:2005的附录D),直到着火大约45分钟。可以通过修改缩减因子0.90(而不是0.88)和0.81(而不是0.62)来改善预测。有了这一改进,预测将变得保守,但在整个切槽阶段都是有效的。根据有限元建模,在中期火灾期间,梁和连接温度的最大差异。在快火下是中跨下法兰温度预测值高估的温度。在大火下,分析预测可能会低估达到的温度。正在准备作为欧洲标准的背景的用于预测连接中温度的新一代分析模型,以改进对火曲线冷却阶段的预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号