The main steam pipe of unit 2 in the upper straight part of the flowing orifice near the platform of deaerator was broken, making the unit shutdown, at 3:46, on llth,June, 1998, in Laiwu Power Plant of shandong Province. (See figure 1) The unit (125MW) was first put into operating in 1973, it had been running for 158400 hours until the failure occurred. The design material of main steam pipe is Fll (X20CrMoWV121), the design parameter is Φ273X 25(mm), the design temperature is 555 ℃,and the design pressure is 13.7MPa, and the main pipe has two side of pipe lines. From 1986, the unit loaded down the main steam changed from 555 ℃ to 540 ℃, the pressure kept the same. The highest main steam temperature is 565℃,the time that beyond the design time is not longer than 1 minute and average 3-4 times each year.
机译:除氧器平台附近流动孔的上直部分的2号机组主蒸汽管破裂,于1998年6月11日下午3:46在山东省莱芜电厂关闭了机组。 (见图1)该机组(125MW)于1973年首次投入运行,已经运行158400小时,直到发生故障。主蒸汽管的设计材料为Fll(X20CrMoWV121),设计参数为Φ273X25(mm),设计温度为555℃,设计压力为13.7MPa,主管有两侧管线。从1986年开始,机组的主蒸汽负荷从555℃改变为540℃,压力保持不变。主蒸汽最高温度为565℃,超过设计时间的时间不超过1分钟,每年平均3-4次。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号