【24h】

A Mental Workload Predicator Model for the Design of Pre Alarm Systems

机译:用于预警系统设计的心理工作量预测器模型

获取原文
获取原文并翻译 | 示例

摘要

This study investigated the operator's mental workload of the fourth Nuclear Power Plant in Taiwan. An experiment including the primary and secondary tasks was designed to simulate the reactor shutdown procedure of the Nuclear Power Plant. The performance of secondary task, the subjective mental workload and seven physiological signals of participant were measured. The Group Method of Data Handling (GMDH) was applied to integrate these physiological signals to develop a mental workload predictive model. The relationship between subject mental workload and the performance of secondary task is highly correlated with Pearson correlation coefficient as 0.691. The validity of the proposed model is very high with R2=0.85. The proposed model is expected to provide supervisor a reference value of operator's performance by giving physiological signals. Besides nuclear power plant, the proposed model could be applied to other fields such as aviation, air transportation control, driving and radar vigilance, etc.
机译:这项研究调查了台湾第四核电站操作员的心理工作量。设计了一个包含主要任务和次要任务的实验,以模拟核电站的反应堆关闭程序。测量次要任务的表现,主观精神负荷和参与者的七个生理信号。应用数据处理的分组方法(GMDH)来整合这些生理信号,以开发出心理负荷预测模型。主体心理工作量与次要任务绩效之间的关系与Pearson相关系数为0.691高度相关。 R2 = 0.85时,该模型的有效性很高。所提出的模型有望通过提供生理信号为主管提供操作员绩效的参考值。除核电站外,该模型还可以应用于航空,航空运输控制,驾驶和雷达警戒等领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号