【24h】

Time Estimation as a Measure of Mental Workload

机译:时间估算是衡量心理工作量的一种方法

获取原文
获取原文并翻译 | 示例

摘要

Technical systems of different kinds might differ in the mental demands they put on their users while being equally usable in a more conventional sense. Several methods exist that measure mental workload. However, in the everyday practice of usability evaluations, none of these methods seems to be used. This is probably due to the amount of effort needed to use them. The study of our errors in estimation of durations show that errors increase as a function of the amount of attentional resources being needed for other concurrent tasks. This points towards a simple way of estimating mental workload. By asking people to provide estimates of elapsed time after a task, disruptions in their estimates could indicate the mental workload of the task. We conducted a first study aimed at validating this idea with the NASA TLX method. Results show that errors in time estimates correlate significantly with TLX scores.
机译:不同类型的技术系统在对用户提出的心理要求上可能有所不同,而在更常规的意义上同样可以使用。存在几种测量精神工作量的方法。但是,在可用性评估的日常实践中,似乎没有使用这些方法。这可能是由于使用它们需要花费大量的精力。对我们估计持续时间的错误的研究表明,错误随着其他并发任务所需的注意力资源数量的增加而增加。这指向估计精神工作量的简单方法。通过要求人们提供任务完成后的时间估计,他们的估计中的中断可能表明任务的精神工作量。我们进行了首次研究,旨在用NASA TLX方法验证这一想法。结果表明,时间估计中的错误与TLX分数显着相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号