首页> 外文会议>International Conference on Dam Engineering; 20041018-20; Nanjing(CN) >Study on special tailrace system of Xiangjiaba Hydroelectric Project
【24h】

Study on special tailrace system of Xiangjiaba Hydroelectric Project

机译:向家坝水电站工程专用尾水系统研究

获取原文
获取原文并翻译 | 示例

摘要

In order to meet the regulation guarantee requirements, and minimize the size of underground cavern complex, the special tailrace system scheme (i.e., roof elevation of the tail-race tunnel will increase with the increase of its length toward downstream and no surge chamber will be arranged) has been adopted for the Xiangjiaba Hydroelectric Project. This paper presents the basic working principle and design philosophy of the special tailrace system, and justifies the viability and rationality of the scheme.
机译:为了满足法规保证的要求并最大程度地减小地下洞穴的复杂性,特殊的尾水系统方案(即尾水隧道的顶棚高度将随着其向下游的长度的增加而增加,并且不会设置任何激流室。向家坝水电工程已采用)。本文介绍了特殊尾赛系统的基本工作原理和设计理念,并证明了该方案的可行性和合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号