【24h】

Technology Readiness among Contractors by Firm Size Categories

机译:按公司规模分类的承包商之间的技术准备情况

获取原文
获取原文并翻译 | 示例

摘要

The impact of globalization and liberalization in our country has been a boon to some but a bane to many others. One group of organizations affected most in a developing country like Malaysia are the construction firms. Since the managers in construction firm are the ones who decide on whether to embark on this perilous journey of technological advances or not, this study specifically focuses on them to gauge their technological readiness. A questionnaire survey was used to collect data from 96 managers of construction firm operating in the northern region of Peninsular Malaysia. Technology Readiness Index (TRI) which refers to people's propensity to embrace and use technologies for accomplishing goals in home life and at work developed by Parasuraman (2000) was adopted to measure the readiness of construction firm managers. The findings showed that the overall TRI score (M=3.18, SD=0.23) indicates that the managers are moderate in terms of their technology readiness. In terms of different firm sizes, bigger firms are more optimistic compared to smaller firms but with no significant difference in the overall TRI.
机译:全球化和自由化对我们国家的影响使某些人受益,但对另一些人却是祸根。建筑公司是在马来西亚这样的发展中国家中受影响最大的一组组织。由于建筑公司的管理者是决定是否进行这一技术进步危险之旅的人,因此本研究专门针对他们以评估他们的技术准备情况。问卷调查被用来收集来自马来西亚半岛北部地区的96家建筑公司经理的数据。技术准备就绪指数(TRI)是指人们倾向于接受和使用技术来实现家庭生活和工作中的目标,这是由Parasuraman(2000)开发的,用于衡量建筑公司经理的准备就绪程度。调查结果表明,总体TRI分数(M = 3.18,SD = 0.23)表明,管理人员的技术准备程度中等。就不同的公司规模而言,与较小的公司相比,较大的公司更为乐观,但总体TRI却没有显着差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号