首页> 外文会议>International SAMPE symposium and exhibition;SAMPE 2004 >TESTING AND EVALUATING THE FRP DECK SYSTEM FOR THE DOUGLAS COUNTY BRIDGE IN WASHINGTON STATE
【24h】

TESTING AND EVALUATING THE FRP DECK SYSTEM FOR THE DOUGLAS COUNTY BRIDGE IN WASHINGTON STATE

机译:华盛顿州道格拉斯县大桥的FRP甲板系统测试和评估

获取原文

摘要

This paper deals with the testing of the FRP deck system supplied by Martin Marietta for the load distribution and strength with wood stringers in the laboratory and evaluation of this system in the field. This system will be used for the rehabilitation of the Chief Joseph Dam Bridge in Douglas County, Washington State. This bridge has a main span of 126 ft. supported by wooden trusses with two approach spans on one side and three approach spans on the other side. All the old wood deck for all the spans will be replaced by the FRP system. The rehabilitation work on this bridge was completed in November 2003. This bridge will be monitored for two years using the latest data acquisition technology to evaluate this FRP deck system in the field especially supported by wood stringers. The laboratory test results and the field evaluation are expected to produce the load distribution of this deck system on wood stringers. This will help the consultant and transportation engineers to design in future this type of deck system supported by wood stringers.
机译:本文讨论了马丁·玛丽埃塔(Martin Marietta)提供的FRP甲板系统在实验室中用木纵梁进行的载荷分布和强度的测试,并在现场对该系统进行了评估。该系统将用于华盛顿州道格拉斯县的约瑟夫大坝大桥的修复。该桥的主跨度为126英尺,由木桁架支撑,一侧有两个进场跨度,另一侧有三个进场跨度。所有跨度的所有旧木甲板将由FRP系统取代。该桥的修复工作已于2003年11月完成。将使用最新的数据采集技术对该桥进行为期两年的监控,以评估该FRP甲板系统在现场的使用,特别是在木纵梁的支持下。预计实验室测试结果和现场评估会在木桁条上产生这种甲板系统的载荷分布。这将有助于顾问和运输工程师将来设计由木桁条支撑的这种甲板系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号