首页> 外文会议>International offshore and polar engineering conference;ISOPE-2003 >Offshore Mooring Pile Design for Recovery of the Ehime Maru
【24h】

Offshore Mooring Pile Design for Recovery of the Ehime Maru

机译:爱媛丸的海上系泊桩设计

获取原文

摘要

Recent recovery of the sunken fishing vessel Ehime Maru;;wasperformed near Honolulu using a shallow staging area in a protectedreef environment. Project restrictions prevented a geotechnicalsubsurface exploration and allowed only two mooring piles;;promptingcontingency pile design using empirical calculations for a range ofpossible conditions. Design assumptions and acceptance criteria weremodified during pile installation using hammer resistance observationsas the primary indicator of geotechnical conditions.
机译:沉没的渔船爱媛丸(Ehime Maru)的近期恢复;在檀香山附近,在受保护的珊瑚礁环境中,使用浅层平台进行了捕捞。项目限制阻止了岩土地下勘探,只允许使用两根系泊桩;在可能的情况下,使用经验计算来进行应急桩设计。在桩安装过程中,使用锤击阻力观察作为岩土条件的主要指标,修改了设计假设和验收标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号