首页> 外文会议>Innovative infrastructures - toward human urbanism : Report >Design and Special Feature of Lusail Ring Bridge
【24h】

Design and Special Feature of Lusail Ring Bridge

机译:卢萨尔环桥的设计与特点

获取原文
获取原文并翻译 | 示例

摘要

The Lusail Development (LD) will comprise residential buildings to house 195,000 residents, retails,rna commercial center, hotels, community facilities and recreational areas. It is bounded to the east byrnsea and to the west by the Al Khor Expressway. The construction Package 3A, Phase 2,is for thernconstruction of Bridge 3, 4, 5, 7 that inter-connect the Qetaifan Islands and Bridge 8& 9 thatrnconnects the Qeitifan Islands to the mainland. Symbolic suspension bridge, referred as Bridges 8rnand 9, are a steel composite box girder bridge with a hoop shaped tower and cable suspensionrnsystem which is a combination of earth-anchored and self-anchored types. The total constructionrncost is approx. 100 million US dollars, and the total construction schedule is 24month; constructionrnbegan at 2011 and is scheduled to be by 2013.
机译:卢萨尔开发区(LD)将包括住宅建筑,可容纳195,000名居民,零售,RNA商业中心,酒店,社区设施和娱乐场所。 Al Khor高速公路与东部的伯恩西和西部相连。 3A阶段2A建造工程用于连接Qetaifan群岛的3、4、5、7号桥和将Qeitifan群岛与大陆连接的8&9号桥的建造。象征性的悬索桥,称为8rnand 9号桥,是一种钢复合箱梁桥,具有箍形塔架和电缆悬索系统,是土锚和自锚类型的组合。总的建设成本约为。 1亿美元,总工期24个月;始建于2011年,并计划于2013年建成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号