首页> 外文会议>Information Systems for Crisis Response and Management (ISCRAM), 2011 International Conference on >Research on WBS-based risk identification and the countermeasures for real estate projects' entire course
【24h】

Research on WBS-based risk identification and the countermeasures for real estate projects' entire course

机译:基于WBS的房地产项目全过程风险识别与对策研究

获取原文
获取原文并翻译 | 示例

摘要

Real estate is a typical industry with high risk, and the real estate project development has the attribution of huge investment, long construction period and is vulnerable to the environmental interference. It is critical to achieve risk identify and strengthen risk management for real estate projects. The paper will apply the method of Work Breakdown Structure (WBS) from scope management of project management to make factor analysis on the real estate projects' entire course for quality management. We will breakdown the entire real estate projects' course into separate phases. They are the start-up phase, design and planning phase, implementation phase and final phase. Then we will identify the primary types and reasons of risks existed and put forward some corresponding countermeasures and suggestions in order to achieve risk management control for the real estate projects' entire course.
机译:房地产是典型的高风险行业,房地产项目开发具有投资大,建设周期长,易受环境干扰的特点。重要的是要实现风险识别并加强房地产项目的风险管理。本文将从项目管理范围管理中运用工作分解结构(WBS)方法,对房地产项目质量管理全过程进行因素分析。我们会将整个房地产项目的过程分解为不同的阶段。它们是启动阶段,设计和计划阶段,实施阶段和最后阶段。然后,我们将找出存在风险的主要类型和原因,并提出相应的对策和建议,以实现房地产项目全过程的风险管理控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号