首页> 外文会议>Indonesian Petroleum Association Annual Convention v.2; 20031014-20031016; Jakarta; ID >COST EFFECTIVE MANAGEMENT THROUGH IMPLEMENTATION OF ALLIANCE CONTRACT FOR SUBMERSIBLE PUMP SYSTEM IN P.T. CALTEX PACIFIC INDONESIA
【24h】

COST EFFECTIVE MANAGEMENT THROUGH IMPLEMENTATION OF ALLIANCE CONTRACT FOR SUBMERSIBLE PUMP SYSTEM IN P.T. CALTEX PACIFIC INDONESIA

机译:通过实施P.T.潜水泵系统联盟合同的成本有效管理加德士太平洋印度尼西亚

获取原文
获取原文并翻译 | 示例

摘要

Today's business, including the oil and gas business, forces companies to be more effective and efficient if they want to survive in global competition. Reserves are decreasing while the price of goods and services required for development and operations are increasing. Improving efficiency in managing lifting equipment, as well as managing inventory that leads to cost reduction, are now becoming more critical to the success of most companies. Alliances, one of the many purchasing strategies, have a huge potential in Indonesia that will significantly improve efficiency of managing company assets. This strategy is an untapped opportunity for many companies in Indonesia. PT Caltex Pacific Indonesia (CPI), as a BPMIGAS Production Sharing Contractor, has implemented an alliance strategy for full services submersible pump system (SPS). The Full Services of SPS Strategy Alliance contract include switchboard, power cable and all lifting equipments as the basic strategy. It is expected that using alliances as a managing strategy will allow CPI to increase the average SPS run life. Beside reducing cycle time for procurement of SPS, this system will also give a significant impact in a number of SPS short run life failures, lower the average well down time, and reduce current power usage and CPI inventory, which provide PT. CPI with better cost and quality. The estimated annual Alliance cost savings in Minas is US$ 4.5 Million plus power consumption reduction. Alliance power consumption data are not currently available. In 2002, the Alliance strategy had reduced early life failures from 40% to 12%. In the same year, only 15% of the Alliance wells failed compared to 88% of the non-Alliance wells. PT. CPI is estimating potential savings of several million dollars as a result of the implementation of strategic alliances. These alliances serve as a basic strategy for managing artificial lift. This paper will share processes in generating and implementing alliances as a basic strategy for managing lifting equipment in CPI. This paper will also discuss and outline the process used to generate the alliances.
机译:当今的业务(包括石油和天然气业务)迫使公司要想在全球竞争中生存下去,就必须变得越来越有效。储备在减少,而开发和运营所需的商品和服务价格却在上涨。现在,提高起重设备的管理效率以及管理库存以降低成本的方法对于大多数公司的成功变得越来越重要。联盟是众多购买策略之一,在印度尼西亚具有巨大的潜力,将大大提高公司资产管理的效率。对于印度尼西亚的许多公司来说,这种策略是一个未开发的机会。作为BPMIGAS生产共享承包商的印尼PT加德士太平洋(CPI)已为全服务潜水泵系统(SPS)实施了一项联盟战略。 SPS战略联盟的全方位服务合同包括配电盘,电缆和所有起重设备作为基本战略。预期将联盟用作管理策略将使CPI延长SPS的平均使用寿命。除了减少采购SPS的周期时间之外,该系统还将对许多SPS短期使用寿命故障产生重大影响,减少平均油井停机时间,并减少提供PT的当前电力使用量和CPI库存。 CPI具有更好的成本和质量。据估计,米纳斯联盟每年的成本节省为450万美元,外加能耗降低。当前没有联盟功耗数据。在2002年,联盟策略已将早期失败的比例从40%降低到12%。同年,同盟非盟井中只有88%的井发生故障,而非盟井中只有88%。 PT。 CPI估计,由于实施战略联盟,可能节省数百万美元。这些联盟是管理人工举升的基本策略。本文将分享建立和实施联盟的过程,将其作为在CPI中管理起重设备的基本策略。本文还将讨论和概述用于生成联盟的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号