【24h】

BP VIETNAM - BUILDING A VIETNAMESE COMPANY

机译:BP越南-建立越南公司

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the strategy BP developed and the processes it used to build its Upstream Operation in Vietnam. This strategy followed a simple 3-point plan which covered recruitment, through training and finally retention. It describes the processes used to develop competency and provide assurance that BP has the right skills in the right place at the right time -both now and in the future. The facilities include the Lan Tay offshore gas platform, the Dinh Co Terminal and the Phu My 3 Power Station. BP has recruited and trained over 250 technicians and support staff over the past 3 years to commission, operate and maintain these facilities.
机译:本文介绍了BP开发的战略及其在越南建立上游业务所使用的流程。该策略遵循一个简单的三点计划,该计划涵盖了通过培训和最终保留的招聘。它描述了用于发展能力并确保BP在现在和将来在正确的时间在正确的位置拥有正确的技能的过程。这些设施包括Lan Tay海上天然气平台,Dinh Co码头和Phu My 3电站。在过去的三年中,BP招聘和培训了250多名技术人员和支持人员,以调试,操作和维护这些设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号