【24h】

55 INTEGRATED CONSTRUCTION PROJECT MANAGEMENT SYSTEM BASED ON IFC AND ISO9001:2000

机译:55基于IFC和ISO9001:2000的综合建设项目管理系统

获取原文
获取原文并翻译 | 示例

摘要

We present a conceptual framework enabling to manage broad set of activities supported by multi-module software application for construction project management. The proposed structure is based on a common building information model (the industry standard IFC Model - ISO PAS 16739), the ISO 9001:2000 Quality Management System, for high-level process specification, and an integrated software infrastructure encompassing the product and process information exchange among the CAD-ERP and Scheduling Systems that support IFC. In this context, we developed Construction Management Phases for Software Interoperability, Organizational and IT Management Processes with using of ARIS methodology in order to implement IFC views. Based on this, we outline a web-based environment enabling to plug in all component tools via a common client, providing a coherent GUI.
机译:我们提出了一个概念框架,可以管理由多模块软件应用程序支持的广泛活动集,以进行建筑项目管理。提议的结构基于通用的建筑信息模型(行业标准IFC模型-ISO PAS 16739),用于高级过程规范的ISO 9001:2000质量管理系统以及包含产品和过程信息的集成软件基础结构支持IFC的CAD-ERP和计划系统之间的交换。在这种情况下,我们使用ARIS方法开发了软件互操作性,组织和IT管理流程的建设管理阶段,以实现IFC的观点。基于此,我们概述了一个基于Web的环境,该环境使得可以通过一个公共客户端插入所有组件工具,从而提供一个一致的GUI。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号