首页> 外文会议>IEEE International Symposium on Electromagnetic Compatibility;IEEE Asia-Pacific Symposium on Electromagnetic Compatibility >Investigation of leveling methods in military susceptibility testing: “Leveling under CW signal” and “Leveling under modulated signal”
【24h】

Investigation of leveling methods in military susceptibility testing: “Leveling under CW signal” and “Leveling under modulated signal”

机译:军事敏感性测试中的调平方法研究:“ CW信号下的调平”和“调制信号下的调平”

获取原文

摘要

Military radiated susceptibility tests performed in accordance with the RS103 section of the MIL-STD461F standard use a 1 kHz, 50% duty cycle pulse modulation during the dwell time in the exposure period of the Device Under Test (DUT). The military standard requires reaching the target field, alias “leveling”, under the modulation unlike its civil counterpart IEC61000-4-3. In other words, in military testing, the modulation must be activated before starting the leveling process and continued during the entire test. On the other hand, the civil radiated susceptibility test performed as per IEC61000-4-3 requires a leveling period under the continuous wave (CW) signal (CW Leveling), thereafter the required modulation (mostly 1 kHz 80% AM) is applied for exposure. Although the military standard stipulates the activation of the modulation before starting the leveling process and its continuation during the entire leveling process, military tests in practice in many laboratories are performed by first using the leveling with the CW signal, afterwards the modulation during the dwell time like the method used in civil applications, for the sake of ease. Furthermore, many test software solutions designed for EMC susceptibility tests employ the same method also for military radiated susceptibility tests as the modulation after the leveling with the CW signal presents an easier and more comfortable test method than the leveling with modulation. Besides, the leveling with the CW signal does not necessitate the use of pulse factors of measurement devices, so that it saves the laboratory from the burden of taking many factors into account. In this research, we investigated the effects of these two leveling methods in detail and emphasized possible differences in test results which may be caused by them. We also used an actual DUT in order to demonstrate that a DUT may fail during the leveling with the CW signal but may pass the test during the dwell time period with modulation which is the actual period desired by the standard to check the DUT for failure. Finally we make some recommendations about the application of military susceptibility testing methods to awaken EMC laboratories to potential pitfalls of the leveling method performed with the CW signal.
机译:根据MIL-STD461F标准的RS103部分进行的军事辐射敏感性测试在被测器件(DUT)的暴露时间内的驻留时间内使用1 kHz,占空比为50%的脉冲调制。与民用标准IEC61000-4-3不同,军事标准要求在调制下达到目标领域,即别名“水平”。换句话说,在军事测试中,必须在开始找平过程之前激活调制,并在整个测试过程中继续进行调制。另一方面,按照IEC61000-4-3执行的民用辐射敏感性测试需要在连续波(CW)信号下进行平整周期(CW Leveling),然后再应用所需的调制(大多数为1 kHz 80 \%AM)曝光。尽管军用标准规定了在开始调平过程之前必须激活调制并在整个调平过程中继续进行调制,但实际上,在许多实验室中,军事测试都是通过首先使用带有CW信号的调平进行的,然后在驻留时间内进行调制为了方便起见,类似于民用中使用的方法。此外,许多为EMC磁化率测试而设计的测试软件解决方案也对军用辐射磁化率测试采用了相同的方法,因为用CW信号进行水准测量后的调制比使用调制的水准测量提供了一种更轻松,更舒适的测试方法。此外,使用CW信号进行调平无需使用测量设备的脉冲因数,从而使实验室免除了考虑许多因素的负担。在这项研究中,我们详细研究了这两种调平方法的效果,并强调了可能由它们引起的测试结果差异。我们还使用了一个实际的DUT,以证明DUT在用CW信号进行调平过程中可能会失败,但可能会在驻留时间段内通过调制测试,这是标准检查DUT失败所需的实际周期。最后,我们对军事敏感性测试方法的应用提出一些建议,以唤醒EMC实验室以CW信号执行水准测量方法的潜在陷阱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号