首页> 外文会议>IEEE Grenoble Power Tech >Underfrequency load shedding in large interconnection
【24h】

Underfrequency load shedding in large interconnection

机译:大型互连中的低频负载削减

获取原文

摘要

Possible interconnection of the European Network of Transmission System Operator for Electricity (ENTSO-E) and joint power system of the former USSR (IPS/UPS) will cause the necessity to evaluate the security state of large transmission systems. One important problem for a large interconnection is the frequency control. This paper considers distinctions of frequency control in interconnected power systems during emergency situations with a deep frequency drop. To restore the system to its normal operating frequency, automatic underfrequency load shedding (UFLS) serves as a last-resort tool to prevent the system from collapse. This paper presents results of analysis of frequency behavior for different algorithms of UFLS and possible solutions of frequency control problem. The frequency behavior is analyzed for different active power deficiencies in different sides of interconnection. Due to the difference in the UFLS structure in both systems either overfrequency or low frequency situations can take place during operation of load shedding. For more reliable frequency restoration process smart uniform philosophy of the load shedding system should be preferable.
机译:欧洲输电系统运营商网络(ENTSO-E)与前苏联的联合电力系统(IPS / UPS)之间可能的互连将导致评估大型输电系统安全状态的必要性。大型互连的一个重要问题是频率控制。本文考虑了在频率急剧下降的紧急情况下互连电力系统中频率控制的区别。为了使系统恢复到正常工作频率,自动低频减载(UFLS)可作为防止系统崩溃的最后手段。本文介绍了针对不同UFLS算法的频率行为分析结果以及频率控制问题的可能解决方案。针对互连的不同侧中的不同有功功率缺陷,分析了频率特性。由于两个系统中UFLS结构的不同,在减载操作期间可能会发生过频或低频情况。为了获得更可靠的频率恢复过程,应优先采用减载系统的智能统一方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号