Snorre B Project - Contract Strategies and Project Execution

机译:Snorre B项目-合同策略和项目执行

获取原文
获取原文并翻译 | 示例

摘要

This paper focuses on the contract strategy and project execution and the final result of the Snorre B project, located in the Tampen area of the Norwegian continental shelf. The project comprise a semisubmersible production platform with full drilling facilities, subsea development for 26 wells, gas export/Import facilities and oil export to Statfjord B for storage and offloading. The principle behind the contract strategy was that the contractors should tender a product developed inhouse instead of being forced to bid on a product developed by the oil company through a study phase. The contracts were signed in April 1998 and production start was June 27, 2001 which was 2 months ahead of schedule.
机译:本文重点研究合同策略和项目执行以及位于挪威大陆架坦彭地区的Snorre B项目的最终结果。该项目包括一个具有完整钻探设施的半潜式生产平台,用于26口井的海底开发,天然气出口/进口设施以及向Statfjord B出口石油以进行存储和卸载。合同策略的原理是,承包商应招标内部开发的产品,而不是在研究阶段被迫竞标石油公司开发的产品。合同于1998年4月签订,生产开始于2001年6月27日,比原计划提前了2个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号