【24h】

Application of Strut-and-Tie Model in Structural Concrete Repair

机译:压杆模型在混凝土结构修复中的应用

获取原文
获取原文并翻译 | 示例

摘要

The subject of this paper is the structural assessment and repair of multiple large pile caprnfoundations. A combination of high temperatures during early hydration and inadequate steelrnreinforcement resulted in large cracking that compromised the structural integrity of the caps to thernextent that repair and modificationwere necessary. New pile caps, placed on top of the existingrncaps, were designed to support the existing loads and superimposed loads that would result from arnfuture buildout. The new pile caps were designed in accordance with the strut-and-tie provisions ofrnthe 2002 ACI 318 Code and constructed with a high-strength, self-compacting concrete.
机译:本文的主题是多个大型桩基的结构评估和修复。早期水化过程中的高温与钢的强化不足相结合,导致大的开裂,从而破坏了瓶盖的结构完整性,以至于需要进行修理和修改。将新的桩帽放置在现有桩帽的顶部,旨在支撑现有的载荷和由arnfuture堆积产生的叠加载荷。新的桩帽是根据2002 ACI 318规范的撑杆和绑扎规定设计的,并使用高强度,自密实混凝土建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号