Long-span Steel Truss Arch Bridge Construction and Innovation

机译:大跨度钢桁架拱桥的建设与创新

获取原文
获取原文并翻译 | 示例

摘要

The new bridge under construction in Zhuhai, China, is a dominant project of Jinding-Gaolan road,rnwhich is the vital communication line throughout Zhuhai. The superstructure of main bridge isrn100m + 400m + 100m steel truss tied-arch bridge. The bridge is assembled symmetrically from sidernspan to middle span. Except for 1# segment and 2# segment of side span assembled by truckrncrane, all the other truss segments are assembled by 80t girder erection crane using cantileverrnerection method. Cable-stayed system is adopted to help mid-span arch erection and ensurernsafety during the whole process. After arch closure, rigid tie bar segments of mid-span can bernerected by deck derrick crane. Instead of temporary flexibility tie bar, temporary locked bearingrnhas been invented to resistant horizontal force at arch springer during rigid tie bar construction, sornas to satisfy navigation requirement of first grade waterway at worksite.
机译:珠海新桥正在建设中,是金顶至高栏路的重要项目,是整个珠海重要的通讯线路。主桥上部结构为100m + 400m + 100m钢桁架拱桥。桥从侧跨到中跨对称组装。除用叉车装配的1#段和2#段的跨度外,其余所有桁架段均采用悬臂梁法通过80t梁架吊进行装配。采用斜拉系统,有助于跨中足弓的勃起,并在整个过程中确保安全。拱形关闭后,中跨的刚性拉杆段可被桥架起重机吊起。代替临时挠性系杆,已经发明了临时锁定的轴承,以抵抗刚性系杆施工期间拱形弹簧处的水平力,索纳斯以满足现场一级水道的航行要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号