The main constructing methods of metro tunnel include shield tunneling method (TBM) and mining method. The quality of the tunnel constructed by mining method is less stable than by TBM. Various faults may occur during the construction. The tunnel should be inspected by reliable inspecting methods. The inspecting practices in Shenzhen metro indicate that ground penetrating radar (GPR) can be used to exactly inspect the thickness of the second lining, the rebar distribution within the second lining, the dense of the second lining concrete, the cave distribution behind the second lining and so on.
机译:地铁隧道的主要施工方法包括盾构法和采矿法。用采矿法建造的隧道质量比用TBM法稳定。施工期间可能会发生各种故障。隧道应采用可靠的检查方法进行检查。深圳地铁的检查实践表明,可以使用探地雷达(GPR)准确检查第二衬砌的厚度,第二衬砌内的钢筋分布,第二衬砌混凝土的密实度,第二衬砌后面的洞穴分布等等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号