首页> 外文会议>Ground engineering in a changing world >Professional Performance, Innovation and Risk (PPIR) for Engineers
【24h】

Professional Performance, Innovation and Risk (PPIR) for Engineers

机译:工程师的专业绩效,创新和风险(PPIR)

获取原文
获取原文并翻译 | 示例

摘要

The Australian engineering profession has established standards for competency and ethics, but lacksrnthe necessary third element, a definition of the standard of performance that engineering professionalsrnshould expect of themselves and each other. This issue has been addressed in the ProfessionalrnPerformance Innovation and Risk (PPIRTM) project undertaken by the Warren Centre for AdvancedrnEngineering, which considered the role of the engineering professional and the performance,rninnovation and risk management aspects; expectations of the community and clients; contemporaryrncommercial and professional realities impacting the work of the engineering professional; complexitiesrnof law and liability; engineering risk and responsible risk-taking; and the relationships betweenrnprofessional performance, innovation and risk.rnThe work by the Warren Centre resulted in the publication of the 2009 Report “ProfessionalrnPerformance, Innovation and Risk in Australian Engineering Practice” which included the PPIRrnProtocolTM, which defines the expected performance for engineering professionals.rnA new project team has been established to manage the roll-out of the PPIR protocol within thernAustralian engineering profession and industry. Key objectives of this phase are to disseminate thernPPIR Report, provide education and training and have the engineering industry and profession adoptrnthe Protocol. This phase of the work is being sponsored by a number of engineering and contractingrncompanies, public and private sector operators and representatives from the legal and insurancernindustries. The work is also supported by a wide range of professional associations.rnThe new approach will have a direct bearing on the professional performance of geotechnicalrnengineers in Australia.
机译:澳大利亚的工程专业已经建立了能力和道德标准,但缺乏必要的第三要素,即工程专业人士对自己和彼此期望的绩效标准的定义。沃伦高级工程技术中心承担的专业性能创新和风险(PPIRTM)项目已解决了该问题,该项目考虑了工程专业人士的角色以及绩效,创新和风险管理方面的问题;社区和客户的期望;当代的商业和专业现实影响着工程专业人士的工作;法律和责任的复杂性;工程风险和负责任的冒险精神;沃伦中心(Warren Center)的工作导致发表了2009年报告“澳大利亚工程实践中的专业,创新和风险”,其中包括PPIRrnProtocolTM,该协议定义了工程专业人士的预期绩效。已经建立了新的项目团队,以管理澳大利亚工程专业和行业中PPIR协议的推出。该阶段的主要目标是传播PPIR报告,提供教育和培训,并使工程行业和专业人士采用该协议。这项工作的阶段是由许多工程和承包商公司,公共和私营部门运营商以及法律和保险行业的代表赞助的。这项工作还得到了众多专业协会的支持。新方法将直接影响澳大利亚岩土工程师的专业表现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号