POWER PLANT PROJECT PLAN MANAGEMENT

机译:电厂项目计划管理

获取原文
获取原文并翻译 | 示例

摘要

With the thorough development in the theoretical research of modern project management, the improvement of controlling and planning means and the accumulation of management experience, especially the extensive application of highly developed network and computer technology in the project management. It already becomes possible to carry on dynamic and rolling adjustment to the project under construction in a short time, which greatly reduces project cost and risk, shortens the project time and guarantees the project quality. Take the project to reclaim land from sea as an example, in October 2003, attacked by the strongest storm in the century, the sea dams and embankments are damaged seriously. By using P3 software we adjusted and refined the process plan, mainly through shortening the time limit of the key work and increasing the resource input on the key route to meet the demand for project time controlling, changed partly the logic relation, mainly the organizing logic, strengthened the cooperation between designer and implementation contractor, refined and improved the design plan and implementation craft of soft base and vacuum pigeonhole cushion layers reclaimed from the sea, shortens the time limit by 3 months, saved expenses for more than 9 million Yuan, recovered the entire time loss caused by the calamity, continued the following-up project without any influence, and completed the project within time limit, estimated cost arid quality of goal plan. Through the past work we realize that recognition and instruction of leaders is the key to accomplish the management, we just make the first step in modern project management and the P3 software application, and that massive project management hasn't been comprehensively launched. We'll unceasingly carry on the exploration and summarization on this train of thoughts. Going forward in the exploration, GCPP will be constructed as the first-class at home, and the outstanding engineering project reaching international level.
机译:随着现代项目管理理论研究的深入发展,控制和计划手段的改进以及管理经验的积累,特别是高度发达的网络和计算机技术在项目管理中的广泛应用。已经可以在短时间内对在建工程进行动态,滚动调整,大大降低了工程成本和风险,缩短了工程时间,保证了工程质量。以开垦土地为例,2003年10月,在本世纪最强烈的风暴袭击下,海坝和堤防受到严重破坏。通过使用P3软件,我们调整和完善了流程计划,主要是通过缩短关键工作的时限和增加关键路线上的资源投入以满足项目时间控制的需求,部分改变了逻辑关系,主要是组织逻辑,加强了设计者与实施承包商的合作,完善和完善了海上回收的软基层和真空鸽洞垫层的设计方案和实施工艺,将工期缩短了3个月,节约了支出900万元以上,因灾难造成的整个时间损失,继续进行后续项目而没有任何影响,并在期限,预算成本和目标计划质量之内完成了该项目。通过过去的工作,我们意识到领导者的认可和指导是完成管理的关键,我们只是迈出了现代项目管理和P3软件应用程序的第一步,而大规模的项目管理尚未全面启动。我们将不断地对此思路进行探索和总结。在勘探方面,GCPP将被建设为国内一流,其杰出的工程项目将达到国际水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号