LINDE FUSRAP SITE REMEDIATION, UTILITY TUNNEL REPLACEMENT, ANDINDUSTRY OPERATIONS: A CASE STUDY OF CHALLENGES MET IN WESTERNNEW YORK

机译:LINDE FUSRAP站点修复,公用事业隧道更换和工业运营:以纽约州西部的挑战标准为例

获取原文
获取原文并翻译 | 示例

摘要

Building 14 was a radiologically impacted Manhattan Engineer District-era (MED) structure atrnthe Linde Formerly Utilized Site Remedial Action Program (FUSRAP) remediation site inrnTonawanda, New York that required dismantlement in 2004. Remedial action at the Linde Siternrequired simultaneous radioactive contamination cleanup, active industrial facility infrastructurernrelocation and uninterrupted facility operations. The challenge was to design and construct arnreplacement subsurface utility tunnel, relocate numerous active utilities, and remove allrnradioactive contamination within the new tunnel’s footprint within 16 months to allow Buildingrn14 dismantlement to start on time. The U.S. Army Corps of Engineers – Buffalo Districtrn(USACE) and Shaw Environmental, Inc. (Shaw) worked in close cooperation with the facilityrnowner to design and execute the work. Meeting the challenge involved design and constructionrnof a new structure, a large open excavation between closely spaced steel and masonry buildings,rnand of several utility systems including high-pressure steam, high voltage electric, and fiber opticrncommunications concurrent with removal of several thousand tons of uranium-238 (U-238),rnradium-226 (Ra-226), and thorium-230 (Th-230) impacted material. Design started in Februaryrn2003 and construction was completed in June 2004 to meet the Building 14 dismantlement startrndate.
机译:14号楼是受到放射影响的曼哈顿工程师区时代(MED)建筑物,位于纽约的林德前利用场地补救行动计划(FUSRAP)修复场地innTonawanda,需要在2004年拆除。林德场地的补救行动要求同时进行放射性污染清除,积极工业设施基础设施的重新安置和不间断的设施运营。面临的挑战是设计和建造取代人工地下的公用设施隧道,重新安置大量活动的公用设施,并在16个月内清除新隧道足迹内的所有放射性污染物,以使Buildingrn14能够按时拆除。美国陆军工程兵部队–布法罗区(USACE)和Shaw Environmental,Inc.(Shaw)与设施所有者密切合作,设计并执行了这项工作。应对挑战包括设计和建造新的结构,在狭窄的钢结构和砖石建筑之间进行大型的开挖,大量的公用事业系统,包括高压蒸汽,高压电力和光纤通讯,同时清除数千吨铀-238(U-238),rn 226(Ra-226)和th 230(Th-230)撞击的材料。设计于2003年2月开始,并于2004年6月完成建设,以符合14号楼的拆除开始日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号