【24h】

Construction of the Line C San Giovanni station in Rome

机译:罗马C线San Giovanni站的建设

获取原文
获取原文并翻译 | 示例

摘要

The construction of Rome’s Line C San Giovanni station required adopting building techniques suitable for responding to the numerous problems concerning geology, archaeology, public utilities and surrounding buildings. The procedures for building this station were strongly constrained by what emerged unexpectedly at the start of the work sites: the presence of archaeological findings down to a depth of 18 m below ground level.rnThese findings required an overall revision of the Line C’s design in the historic centre of the city of Rome, starting from the San Giovanni station, to safeguard archaeologically sensitive strata.
机译:罗马的C线San Giovanni站的建设要求采用适合应对地质,考古,公共事业和周围建筑物等众多问题的建筑技术。在工地开始时出乎意料的是,建造这个气象站的程序受到了极大的限制:考古发现的存在一直到地面以下18 m的深度。这些发现需要对C线的设计进行整体修订。罗马市的历史中心,从San Giovanni站开始,以保​​护考古敏感地层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号