首页> 外文会议>Geotechnical aspects of underground construction in soft ground >Stress-path and piezometric head field analysis of soil during earth pressure balanced shield tunneling
【24h】

Stress-path and piezometric head field analysis of soil during earth pressure balanced shield tunneling

机译:土压力平衡盾构掘进过程中土的应力路径和测压水头场分析

获取原文
获取原文并翻译 | 示例

摘要

The effects of earth pressure balanced (EPB) tunneling on the soil stress path and piezometricrnhead of the soil during tunnel advancement are considered in this study. First, the 3D stress distributions of thernarea near the crown and spring line of the tunnel are investigated, after which the tunnel stress path with respectrnto the Mohr–Coulomb yielding surface is presented. Next, by taking into account the three significant factorsrnof a) advance rate of the tunnel face, b) consolidation coefficient of the soil, and c) overburden depth of therntunnel, a parametric study is conducted and the effect of EPB tunneling on the piezometric head field of the soilrnis examined.
机译:本研究考虑了隧道掘进过程中土压力平衡(EPB)隧穿对土壤应力路径和测压头的影响。首先,研究了隧道顶面和弹簧线附近的热晶3D应力分布,然后给出了相对于Mohr-Coulomb屈服面的隧道应力路径。接下来,考虑到三个重要因素:a)隧道工作面的前进速度; b)土壤的固结系数; c)隧道的上覆深度;进行了参数研究,以及EPB隧道对测压头的影响检查了土壤的领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号