Keeping the face support in soft ground TBM tunnelling

机译:在软土地基TBM隧道中保持面部支撑

获取原文
获取原文并翻译 | 示例

摘要

Even with decades of experience in soft groundTBM tunneling, the estimation of the necessaryrnface support pressure still is a difficult task. Still too often projects give the impression that the designer wasrnhappy to find a calculation model in a publication and to copy it, but without understanding the theory behindrnit and sometimes not even the very basics of geomechanics. If then there is a problem with either a collapsernor excessive settlements, the necessary experience for this emergency situation is naturally even less than thernexperience for the regular advance. Often critical time is lost during days or even weeks of discussion and whenrnaction is finally taken only the time-consuming and cost intensive options remain.rnMany different ways for the stabilization of the disturbed soil in front of the TBM have been tried over thernyears and most have been found to be problematic if not totally ineffective. While fast action is often helpful tornprevent the situation from becoming worse, the activities must be carried out in the right order and at the rightrntime. Experience has shown that the consulting of external help is often the much more effective way, both costrnand time wise, than trying to solve the problems by trial and error.
机译:即使有数十年的软土地基TBM隧道经验,估计必要的地面支撑压力仍然是一项艰巨的任务。项目仍然经常给人一种印象,即设计师很乐意在出版物中找到计算模型并复制它,但是却不了解背后的理论,有时甚至不了解地质力学的基本原理。如果那时出现倒塌或过度定居的问题,那么这种紧急情况的必要经验自然会少于常规前进的经验。在几天甚至几周的讨论中,关键时间往往会浪费,最终采取行动后,仅剩下耗时且成本高昂的选择。在过去的几年中,人们尝试了许多不同的方法来稳定TBM前方的受扰土壤。已经发现,即使不是完全无效,也存在问题。快速行动通常有助于防止情况恶化,但必须以正确的顺序和正确的时间进行活动。经验表明,在成本和时间方面,咨询外部帮助通常比尝试通过试错法解决问题更为有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号