首页> 外文会议>Geotechnical aspects of underground construction in soft ground >A field case study on construction of underground passageway with non-open excavation method
【24h】

A field case study on construction of underground passageway with non-open excavation method

机译:非露天开挖施工地下通道的现场案例研究

获取原文
获取原文并翻译 | 示例

摘要

In this study, the construction process of non-open excavation cases using DSM and TRCMrnand the field monitoring during construction stage are introduced and the applicability and the stability of thernapplied method are reviewed. The problems occurred in the fields are drawn out and the settlement profiles of therntunnels during the construction stages are analyzed using the field monitoring results. Although both methods arernapplied successfully in the site, it was recognized that some complementary measures are necessary to preventrnthe settlement in soft clay layers. In the future, the usage of non-open methods will be more expanded at thernurban areas. The findings in this study would be a good reference for underground passage way installation.
机译:本文介绍了利用DSM和TRCMrn进行非露天基坑开挖的施工过程,以及施工阶段的现场监测,并综述了该方法的适用性和稳定性。找出现场发生的问题,并利用现场监测结果分析施工过程中隧道的沉降曲线。尽管两种方法均已在现场成功应用,但已认识到需要采取一些补充措施来防止软黏土层中的沉降。将来,非开放式方法的使用将在城市地区进一步扩大。这项研究的结果将为地下通道的安装提供良好的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号